Bridal Veil Pipeline Project – Phase I and II
Project included installation of a new valve and bulkhead in an outlet structure underneath a high mountain lake. The scope of work also included removal and replacement of antiquated pipe with welded carbon steel pipe which serves as a penstock for the Bridal Veil Hydroelectric Plant and an alternate water source for the Town of Telluride.
Due to the location the pipe was flown in with a helicopter.

Las Vegas Street Plant Odor Control System
Installation of concrete foundations, tanks and fiberglass reinforced pipe to facilitate construction of an odor control system.

Spring Valley Wastewater Treatment Plant
Construction of a 500,000 GPD Wastewater Treatment Facility, inclusive of concrete clarifiers, aeration basins and digesters utilizing Aeromod equipment.

Construction of two bridges, one 200 foot long and one 265 foot long, four lane precast concrete girder bridges, the rehab of an existing 300 foot long fly-over bridge and 97,000 SF of M.S.E. retaining wall.