Price Chiller Project

Installed exchangers for Questar Pipeline's Price chilled Water Processing Facility near Price, UT.



Orangeville o2 Compressor Station

Gas Coolers for two unit grassroots Compressor Station for XTO Energy near Orangeville, UT.



Parachute Evaporation Ponds

Tanks and containment for Williams Production RMT's Parachute Produced Water Treatment Facility near Parachute, CO.



Wolverine CPF & Flow Lines

Scope included trim on crude oil storage tanks, hydrocarbon vapor handling system, gas blanket system, bad oil treating, tank bottom recirculation system, produced water treatment system, contact water handling, fuel gas system, fire suppression and flow lines from well pads.

Work consisted of site grading, concrete foundations, process equipment installation, plant piping and cross country pipelines with pig launchers.



Conoco Product Loading Terminal

Installation of two railroad spurs capable of spotting 32 railcars and facilities to unload product from rail cars to storage tanks and truck rack. Scope of work included mechanical installation, product piping, underground piping, concrete foundations, concrete paving, containment dikes and all electrical systems for control, safety and surveillance.